ANALISIS TEKNIS DAN KELAYAKAN EKONOMI SISTEM PEMBANGKIT LISTRIK TENAGA PLTB TURBIN TULIP DAN PLTS MENGGUNAKAN SIMULASI HOMER PRO. (2025). Jurnal SPEKTRUM, 12(3), 235-246. https://doi.org/10.24843/SPEKTRUM.2025.v12.i03.p23