[1]
“ANALISIS TEKNIS DAN KELAYAKAN EKONOMI SISTEM PEMBANGKIT LISTRIK TENAGA PLTB TURBIN TULIP DAN PLTS MENGGUNAKAN SIMULASI HOMER PRO”, SPEKTRUM, vol. 12, no. 3, pp. 235–246, Sep. 2025, doi: 10.24843/SPEKTRUM.2025.v12.i03.p23.