1.
Zakiyyah A, Aryanto A, Wintoro B. PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS. JITS [Internet]. 2024 Sep. 30 [cited 2025 Sep. 4];28(2):168-81. Available from: https://ejournal1.unud.ac.id/index.php/jits/article/view/1390