Zakiyyah, Amirah, Aris Aryanto, and Bayu Wintoro. “ PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS”. Jurnal Ilmiah Teknik Sipil 28, no. 2 (September 30, 2024): 168–181. Accessed September 4, 2025. https://ejournal1.unud.ac.id/index.php/jits/article/view/1390.