“CONTRACTOR’S PERSPECTIVE ON EXECUTION METHOD IMPACT TO COST OVERRUN IN BALI’S BUILDING CONSTRUCTION”. Jurnal Ilmiah Teknik Sipil, vol. 28, no. 1, Mar. 2024, pp. 10-17, https://doi.org/10.24843/JITS.2024.v28.i01.p02.