“CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD”. Jurnal Ilmiah Teknik Sipil, vol. 28, no. 1, Mar. 2024, pp. 88-96, https://doi.org/10.24843/JITS.2024.v28.i01.p09.