[1]
“OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA)”, JITS, vol. 28, no. 2, pp. 116–131, Sep. 2024, doi: 10.24843/JITS.2024.v28.i02.p02.