[1]
“ PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS”, JITS, vol. 28, no. 2, pp. 168–181, Sep. 2024, doi: 10.24843/JITS.2024.v28.i02.p06.