[1]
“CONTRACTOR’S PERSPECTIVE ON EXECUTION METHOD IMPACT TO COST OVERRUN IN BALI’S BUILDING CONSTRUCTION”, JITS, vol. 28, no. 1, pp. 10–17, Mar. 2024, doi: 10.24843/JITS.2024.v28.i01.p02.