[1]
“CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD”, JITS, vol. 28, no. 1, pp. 88–96, Mar. 2024, doi: 10.24843/JITS.2024.v28.i01.p09.