Fauzah, D. (2024) “OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA)”, Jurnal Ilmiah Teknik Sipil, 28(2), pp. 116–131. doi: 10.24843/JITS.2024.v28.i02.p02.