“CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD” (2024) Jurnal Ilmiah Teknik Sipil, 28(1), pp. 88–96. doi:10.24843/JITS.2024.v28.i01.p09.