“OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA)”. 2024. Jurnal Ilmiah Teknik Sipil 28 (2): 116-31. https://doi.org/10.24843/JITS.2024.v28.i02.p02.