“CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD”. 2024. Jurnal Ilmiah Teknik Sipil 28 (1): 88-96. https://doi.org/10.24843/JITS.2024.v28.i01.p09.