ZAKIYYAH, Amirah; ARYANTO, Aris; WINTORO, Bayu. PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS. Jurnal Ilmiah Teknik Sipil, [S. l.], v. 28, n. 2, p. 168–181, 2024. DOI: 10.24843/JITS.2024.v28.i02.p06. Disponível em: https://ejournal1.unud.ac.id/index.php/jits/article/view/1390. Acesso em: 4 sep. 2025.