Fauzah, D., Setyawan, R., Laksmi, A. A., & Soebakti, S. A. (2024). OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA). Jurnal Ilmiah Teknik Sipil, 28(2), 116–131. https://doi.org/10.24843/JITS.2024.v28.i02.p02