M. Fanshurullah Asa, & Anjelita Carmelitas Borges. (2024). CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD. Jurnal Ilmiah Teknik Sipil, 28(1), 88–96. https://doi.org/10.24843/JITS.2024.v28.i01.p09