IMPLEMENTATION OF BIM 5D IN THE IMPLEMENTATION PLAN OF THE TRANS SUMATRA – JAMBI TOLL ROAD WITH CIVIL 3D AND NAVISWORK. (2025). Jurnal Ilmiah Teknik Sipil, 29(2), 192-200. https://doi.org/10.24843/JITS.2025.v29.i02.p09