CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD. (2024). Jurnal Ilmiah Teknik Sipil, 28(1), 88-96. https://doi.org/10.24843/JITS.2024.v28.i01.p09