1.
OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA). JITS. 2024;28(2):116-131. doi:10.24843/JITS.2024.v28.i02.p02