(1)
OPTIMIZING PROJECT SCHEDULING USING CPM AND PERT METHODS (CASE STUDY: PEJAMBON 8-STOREY FLAT, CENTRAL JAKARTA). JITS 2024, 28 (2), 116-131. https://doi.org/10.24843/JITS.2024.v28.i02.p02.