(1)
PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS. JITS 2024, 28 (2), 168-181. https://doi.org/10.24843/JITS.2024.v28.i02.p06.