(1)
CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD. JITS 2024, 28 (1), 88-96. https://doi.org/10.24843/JITS.2024.v28.i01.p09.