[1]
Saraswati, N.M.R.D. and Wiguna, I.P.A. 2024. CONTRACTOR’S PERSPECTIVE ON EXECUTION METHOD IMPACT TO COST OVERRUN IN BALI’S BUILDING CONSTRUCTION. Jurnal Ilmiah Teknik Sipil. 28, 1 (Mar. 2024), 10–17. DOI:https://doi.org/10.24843/JITS.2024.v28.i01.p02.