[1]
Zakiyyah, A. et al. 2024. PIER PERFORMANCE LEVEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY WITH ISOLATOR UNDER EARTHQUAKE LOADS USING TIME HISTORY ANALYSIS. Jurnal Ilmiah Teknik Sipil. 28, 2 (Sep. 2024), 168–181. DOI:https://doi.org/10.24843/JITS.2024.v28.i02.p06.