[1]
M. Fanshurullah Asa and Anjelita Carmelitas Borges 2024. CONTROLLING CONSTRUCTION’S TIME AND COST OF PUSKESMAS WITH EARNED VALUE METHOD. Jurnal Ilmiah Teknik Sipil. 28, 1 (Mar. 2024), 88–96. DOI:https://doi.org/10.24843/JITS.2024.v28.i01.p09.