Ide Dia Selly, and Machmudin Eka Prasetya. “Designing Project Overhead Cost Attribution Calculation Module to Enhance Capital Expenditure Control (Case Study: PT G)”. E-Jurnal Akuntansi, vol. 35, no. 7, Aug. 2025, doi:10.24843/EJA.2025.v35.i07.p06.