[1]
“Designing Project Overhead Cost Attribution Calculation Module to Enhance Capital Expenditure Control (Case Study: PT G)”, E-Jurnal Akuntansi, vol. 35, no. 7, Aug. 2025, doi: 10.24843/EJA.2025.v35.i07.p06.