Ide Dia Selly and Machmudin Eka Prasetya (2025) “Designing Project Overhead Cost Attribution Calculation Module to Enhance Capital Expenditure Control (Case Study: PT G)”, E-Jurnal Akuntansi, 35(7). doi: 10.24843/EJA.2025.v35.i07.p06.