Ide Dia Selly, and Machmudin Eka Prasetya. 2025. “Designing Project Overhead Cost Attribution Calculation Module to Enhance Capital Expenditure Control (Case Study: PT G)”. E-Jurnal Akuntansi 35 (7). https://doi.org/10.24843/EJA.2025.v35.i07.p06.